A soft story retrofit in Los Angeles is mandatory for many older wood-frame apartment buildings with parking or open space on the ground floor. Under City of Los Angeles Ordinance 183893, adopted in 2015, covered buildings must submit plans within 1 year, obtain permits within 2 years, and complete the work within 7 years of receiving the city’s order. Typical retrofits cost roughly $60,000 to $150,000+ per building, often in the range of $5,000 to $10,000 per unit, depending on size and design. Here is what owners need to know.

Which buildings does the soft story ordinance in Los Angeles cover?
- Wood-frame buildings whose permit application was filed before January 1, 1978, or that were built under pre-1978 code standards
- A ground floor with parking or similar open space that creates a soft, weak, or open-front wall line
- At least one story above that ground floor
- Buildings with three or fewer units used only as residences are excluded
The city served orders in priority groups: Priority I for buildings with 16 or more units, Priority II for buildings with three or more stories and fewer than 16 units, and Priority III for the rest. If you own a covered building and are unsure of your status, check with LADBS.
What does a soft story retrofit in Los Angeles cost?
| Building size | Typical retrofit approach | Estimated cost |
|---|---|---|
| 4 to 8 units | Plywood shear walls, steel posts, or cantilever columns | $60,000 to $100,000 |
| 9 to 16 units | Steel moment frames at parking openings | $90,000 to $150,000 |
| 17+ units | Multiple steel frames, foundations, engineering | $150,000 to $300,000+ |
Costs depend on the number of tuck-under parking openings, soil conditions, foundation upgrades, and how much finish work must be replaced. Engineering, permits, and inspections are part of every retrofit budget.
How the soft story retrofit process works
- Engineering evaluation. A structural engineer analyzes the building and designs the retrofit.
- Plan check. LADBS reviews and approves the retrofit plans.
- Construction. New foundations and steel frames or shear walls are installed at the weak ground floor.
- Inspections. The city inspects foundations, welds, and connections before sign-off.
Most residents can stay in their units during construction. The main disruption is to parking areas, which are usually closed in phases.

Can owners pass retrofit costs to tenants?
For buildings under the Rent Stabilization Ordinance, the Los Angeles Housing Department allows owners to apply to recover up to 50 percent of approved seismic retrofit costs, divided among units, with a maximum increase of $38 per month per unit for 120 months. The application must be approved before any increase, so plan the paperwork alongside the construction.
Why acting early pays off
- Engineers and steel fabricators book up as deadlines approach
- Earlier projects avoid rush pricing and compressed schedules
- Missing deadlines can lead to enforcement action by the city
- A completed retrofit reduces risk to residents and the building
Common soft story retrofit methods
- Steel moment frames. Placed at tuck-under parking openings to resist sideways forces while keeping parking usable.
- Cantilever columns. Steel columns anchored into new foundations, useful where space is limited.
- Plywood shear walls. Added along the ground floor where walls can be closed without losing parking.
- New foundations. Grade beams or footings sized to carry the new frames.
What owners should prepare
Gather any original building plans, prior permits, and the city’s order. Plan tenant notices and a phased parking schedule early, and coordinate with your engineer on the rent pass-through application if your building is rent-stabilized. Owners who start early generally get better pricing and a smoother schedule than those working against the final deadline.

Frequently asked questions
What is a soft story building?
A building with a weak ground floor, usually because of tuck-under parking or large openings, beneath one or more stories of living space.
Which buildings must be retrofitted in Los Angeles?
Wood-frame buildings permitted before January 1, 1978, with a soft, weak, or open-front ground floor and at least one story above. Residential buildings with three or fewer units are excluded.
How much does a soft story retrofit in Los Angeles cost?
Many buildings cost $60,000 to $150,000 or more, often about $5,000 to $10,000 per unit.
What are the soft story retrofit deadlines?
From the city’s order: submit plans within 1 year, obtain permits within 2 years, and complete construction within 7 years.
Can I pass soft story retrofit costs to tenants?
For rent-stabilized units, owners can apply to recover up to 50 percent of approved costs, capped at $38 per month per unit for 120 months.
Can tenants stay during a soft story retrofit?
Usually, yes. Work focuses on the ground-floor parking area, which is closed in phases.
Facing a soft story retrofit in Los Angeles? JSN Construction is a licensed, family-owned general contractor (CSLB #1020134) based in North Hills, serving homeowners across the San Fernando Valley and greater Los Angeles. We build and retrofit multifamily buildings across the Valley. See our multi-family construction services and our structural repair services. Call (818) 925-0053 for a free estimate.