A Glendale building permit is issued by the City of Glendale Building & Safety Division through its Permit Services Center, not by LADBS. The center is on the first floor of the Municipal Services Building at 633 E. Broadway, Room 101, and it brings building, zoning, design review, fire, and public works staff together in one place. Many simple electrical, plumbing, mechanical, and solar permits can be applied for online, while remodels, additions, and ADUs go through plan check. Here is how the process works.

The Glendale building department: who does what
| Division | What it reviews |
|---|---|
| Building & Safety | Structural, energy, and code compliance; inspections |
| Zoning | Setbacks, height, lot coverage, and use |
| Design Review | Exterior design for many additions and new homes |
| Fire Department | Access, sprinklers, and hillside fire requirements |
| Public Works | Sewer, grading, drainage, and work in the public right of way |
Because these teams share the Permit Services Center, larger projects can resolve questions from several divisions in one visit or one review cycle.
Online permits in Glendale
Glendale offers online applications for many permit types. For single-family homes and duplexes, these include mechanical, electrical, plumbing, and solar permits. First-time users create an account and verify their email before applying. Projects that need plans, such as additions and layout changes, still start with a plan check submittal. The City of Glendale Building & Safety site lists current permit types and requirements.
Which projects need a Glendale building permit with plan check?
- Room additions, second stories, and new homes
- Kitchen and bathroom remodels that move walls, plumbing, or gas
- Removing or altering load-bearing walls
- ADUs, junior ADUs, and garage conversions
- Retaining walls, grading, and hillside foundations
- Commercial tenant improvements

Design review in Glendale
Glendale places more emphasis on design than many nearby cities. Exterior changes such as second-story additions, larger additions visible from the street, and new homes often go through the city’s design review process before the building permit is issued. Hillside properties can have added standards for grading, height, and fire safety. Build design review time into your schedule, and choose designs that respect the neighborhood’s character to prevent revisions.
Step-by-step process
- Feasibility. Confirm zoning, setbacks, hillside status, and whether design review applies.
- Plans. Architectural, structural, and energy documents.
- Submittal. Plans are routed to each division that needs to review them.
- Corrections. Respond to comments, usually one or two rounds.
- Permit issuance. Pay fees and receive the permit.
- Inspections and final. Inspections are scheduled at each stage until the final sign-off.
How long does a Glendale building permit take?
Simple online permits can be issued quickly. A remodel with plan check often takes several weeks, and an addition with design review can take 2 to 5 months from first submittal. Complete, well-coordinated plans are the most reliable way to shorten that time.
Owner-builder or licensed contractor?
California allows owner-builder permits, but the owner takes on legal responsibility for the work, workers, and inspections. When you hire a licensed contractor, the contractor normally pulls the permit and manages inspections. Verify any contractor’s license on the California CSLB website before you sign.
How to avoid extra correction rounds
- Survey or verify property lines before drawing the site plan
- Show existing and proposed conditions clearly on every sheet
- Coordinate structural drawings with the architectural plans
- Include the Title 24 energy report with the first submittal
- Answer every correction comment in writing when resubmitting
Each correction round can add weeks. Submitting a complete, coordinated package is the single most effective way to move through the Glendale building department quickly.

Frequently asked questions
Where do I get a building permit in Glendale, CA?
At the City of Glendale Permit Services Center, 633 E. Broadway, Room 101, or online for many simpler permit types.
Does LADBS issue permits in Glendale?
No. Glendale is its own city, so permits come from the City of Glendale, not LADBS.
Can I get a Glendale building permit online?
Yes, for many single-family mechanical, electrical, plumbing, and solar permits. Projects that need plans still go through plan check.
Does my addition need design review in Glendale?
Many exterior changes, such as second-story additions and larger additions visible from the street, go through design review before the permit is issued.
How long does it take to get a permit in Glendale?
Simple permits can be quick. Remodels often take several weeks, and additions with design review can take 2 to 5 months.
Who pulls the permit, me or my contractor?
When you hire a licensed contractor, the contractor normally pulls the permit and schedules inspections.
Need help with a Glendale building permit? JSN Construction is a licensed, family-owned general contractor (CSLB #1020134) based in North Hills, serving homeowners across the San Fernando Valley and greater Los Angeles. We prepare plans, manage plan check and design review, and build in Glendale. See our home remodeling services and our Glendale service page. Call (818) 925-0053 for a free estimate.