Every construction project in Los Angeles — from a room addition to a commercial build-out — starts with proper plans and the right permits. JSN Construction handles both. We prepare the design and engineering drawings, pull the permits with the city, and manage the inspections, so your project is built to code and protected at resale.
Because we are a design-build team, you deal with one company from the first drawing to the final sign-off — not a separate designer, permit runner, and contractor who each point fingers when something goes wrong.
“Plans and permits” covers more than a single drawing. Depending on your project, it can include:
We handle plans and permitting across all the work we do:
The permit process looks roughly the same across most of Los Angeles, though each city runs its own department:




Not every job needs a permit, but most structural, electrical, plumbing, gas, and layout changes do — and adding square footage always does. Cosmetic-only work like painting, flooring, or swapping a fixture usually does not. If you are not sure, that is exactly the kind of thing we sort out for you up front, so there are no stop-work orders or surprises. Permitted work also protects you: unpermitted additions and conversions can cause real problems when you sell or refinance.







Permitting is where a lot of projects stall. Plan-check corrections, missing details, and slow back-and-forth with the city can add weeks or months. We manage that process for you — preparing complete plan sets the first time, responding quickly to corrections, and knowing what each local department expects. The goal is simple: get your permit issued as fast as the city allows, so your project can actually start.

When your designer, engineer, permit runner, and contractor are separate companies, delays and finger-pointing are common. As a design-build team, we own the whole thing. We prepare the plans with the permit in mind, pull the permits ourselves, handle the corrections, and build what was approved. You get one point of contact and one team accountable for the result — from the first sketch to the final inspection.

We pull permits throughout Los Angeles County and the San Fernando Valley. The City of Los Angeles uses LADBS, while cities like Burbank, Glendale, Pasadena, Santa Clarita, and others each run their own building departments with slightly different submittal rules and timelines. We work with all of them regularly, so we know what each one looks for and how to keep your project moving.

Timelines vary by project and city. A straightforward remodel permit can take a few weeks, while additions, new construction, and commercial projects with full plan sets take longer — often one to three months from submittal to issuance, depending on the department’s workload and how many correction rounds are needed. We give you a realistic estimate up front and keep the process moving on our end.